Installation of Interface And Bulk Water Consumer Metering Points – Stage-II

Client: Abu Dhabi Water & Electricity Authority
Consultant: Dr.M.H.Ali El-Saie
Contract Period: 14.01.07 - 31.08.10
Contract Value: 62,200,159.00
Scope of Work:
Supply and installation of: electromagnetic flow meters with remote readout units, pressure transducers and water sampling points; turbine flow meters with pulse units, control valves etc in concrete chambers and associated GRP kiosks; D.I. pipework and valves; Solar Power Supply system with 24V DC outputs or normal 230V AC power supply at the electromagnetic flow meters at different locations in Abu Dhabi with all the associated civil works; testing, commissioning and handing over.