Facebook Twitter Linked In
General Construction Company WLL

Water Supply To 8000 Residential Accommodation and Al Falah Farms

Client: Abu Dhabi Water & Electricity Authority
Consultant: M/s.Khatib & Alami
Contract Period: 14.01.03 - 13.01.06
Contract Value: 91,163,912.00
Scope of Work:
Supply, installation, sterilization, testing and commissioning of:- approximately 6.2KM of 1000mm dia DI pipeline from Unit III to Qasser Rawdat Al Reef Interchange and along Abu Dhabi-Dubai Road to Al Falah Farms; approx. 36KM of 600mm dia DI ring main pipeline around Al Shamkha and Al Shawamikh area including connection with the new 1000mm dia DI line at Al Falah Farms and with the existing 600mm dia pipeline along Abu Dhabi – Dubai expressway; approximately 15KM of 900mm dia DI pipeline along Abu Dhabi Airport Road including connection with the existing 1000mm dia DI pipeline at Al Shawamikh Interchange and with the existing 1200mm dia DI pipeline at Mussaffah Interchange; approx. 4KM of 400mm dia DI pipeline to Khalifa “B” farms; all complete with necessary fittings, valves and accessories; Supply, installation and commissioning of Surge System; Construction all valve chambers, necessary connections; NDRC works and all necessary civil works.